SELECTED ENGINEERING WORK
Projects & Engineering Experience
A selection of petrochemical, gas, polymer and industrial projects spanning process engineering, commissioning, start-up and plant operations.
PROJECT PORTFOLIO
COMMISSIONING
Kuzey Marmara Gas Storage Expansion Project
PROCESS ENGINEERING
Process Engineering Dept. Head
PROCESS ENGINEERING
Process Engineering & Design Validation
Kuzey Marmara Gas Storage Expansion
SPG-Steiner GmbH
Commissioning & Start-Up Supervisor · 2024–2025
Supervised commissioning and start-up for the Kuzey Marmara Gas Storage Expansion Project, ensuring DCS logic validation, BMS software review, and system conformity checks.
Led adsorber bed vessel filling, packing installation, and pre-commissioning activities for the Silica Gel Unit. Developed commissioning and start-up procedures, including DFGH dry-out steps, ensuring seamless project execution.
ABS / Rubber Production Facilities
PADJAM Polymer Development Co
Commissioning & Start-Up Manager · 2021–2025
Supervised pre-commissioning, commissioning, and start-up activities for ABS/Rubber production facilities, ensuring systematic execution in line with TOTAL OPERCOM methodology.
Reviewed commissioning procedures, system readiness, and Pre-Startup Safety Reviews (PSSR). Managed tendering and contractor selection for commissioning and start-up scope, and monitored functional tests, system integration, and operational testing.
Led adsorber bed vessel filling, packing installation, and pre-commissioning activities for the Silica Gel Unit. Developed commissioning and start-up procedures, including DFGH dry-out steps, ensuring seamless project execution.
Process Engineering & Design Validation
PADJAM Polymer Development Co.
Process Engineering Dept. Lead · 2017–2021
Managed a team of five process engineers, overseeing 800+ engineering documents including PFDs, P&IDs, H&MBs, data sheets, and C&E diagrams from licensors and EPC contractors.
Led process simulations and validations using Aspen Plus and HTRI to cross-check consultant-provided designs. Participated in HAZOP studies and close-out implementation, supported contractor claims management involving $55M worth of claims, and proposed design modifications enabling HIPS & GPPS production within ABS plants.
Reviewed commissioning procedures, system readiness, and Pre-Startup Safety Reviews (PSSR). Managed tendering and contractor selection for commissioning and start-up scope, and monitored functional tests, system integration, and operational testing.
Led adsorber bed vessel filling, packing installation, and pre-commissioning activities for the Silica Gel Unit. Developed commissioning and start-up procedures, including DFGH dry-out steps, ensuring seamless project execution.